Electrical Inspections & EICR Compliance

Penmilne celebrating 50 years, 1977 to 2027

As an NICEIC Approved Contractor, Penmilne carries out Electrical Installation Condition Reports (EICRs) and remedial works for homeowners, offices, industrial units, managing agents, retail premises and community buildings across Hertfordshire, Bedfordshire, Cambridgeshire and Buckinghamshire.

Communal submains and distribution boards inspected by Penmilne

NICEIC Approved Contractor, TrustMark endorsed, Aico Platinum Partner, ECA member and CHAS accredited. Serving Hertfordshire, Bedfordshire, Cambridgeshire and Buckinghamshire from our Hitchin premises since 1977.

How often do premises require an EICR?

The Electricity at Work Regulations 1989 require installations to be maintained so they are safe, and IET Guidance Note 3 sets out recommended maximum intervals based on how a building is used. The inspector may recommend a shorter interval depending on the condition of the installation.

Type of premisesRecommended maximum interval
Offices, shops and retail premises5 years
Educational establishments5 years
Community centres and village halls5 years
Industrial units and factories3 years
Leisure complexes and places of public entertainment3 years
Swimming pools1 year

What happens during an EICR?

Testing requires circuits to be isolated for short periods. The sequence of isolations is planned with you in advance so critical equipment, servers and refrigeration are protected and staff know what to expect.

What do the observation codes on an EICR mean?

CodeMeaningAction for duty holders
C1Danger presentImmediate action required whilst on site. The report will be unsatisfactory.
C2Potentially dangerousUrgent remedial work required. The report will be unsatisfactory.
C3Improvement recommendedNot unsafe, but worth planning into future works. The report can still be satisfactory.
FIFurther investigation requiredInvestigate without delay. The report will be unsatisfactory.

Who is responsible for electrical safety in commercial premises?

Employers, the self-employed and anyone in control of non-domestic premises have duties under the Electricity at Work Regulations 1989. In multi-let buildings the landlord is usually responsible for the landlord’s supply and common parts, while tenants are responsible for the installation within their own space, depending on the lease. Insurers and managing agents frequently ask for a current, satisfactory EICR as evidence that these duties are being met.

What our clients say

Excellent contractor who delivers all the required information and repairs on time.

MK, St Albans District Council

Penmilne and Thrive have worked well together to ensure all of our properties are compliant.

DR, Thrive Homes

Electrical inspection questions answered

It depends on the size of the building and the number of distribution boards and circuits. A small office may take a day, while larger industrial or multi-occupancy sites are programmed over several days.

Yes. Isolations are scheduled to minimise disruption, so share your operating hours and any critical systems when booking and the inspection will be planned around them where possible.

In larger installations a representative percentage of accessories and circuits may be tested rather than every point, as agreed with the client beforehand. If faults are found, the sample is increased.

No. Emergency lighting and fire detection systems have their own testing requirements; these are carried out and recorded separately.

Yes. Penmilne can provide a quote for any remedial items straight after the inspection. We can then complete the work and issue certification so the installation is brought back to a satisfactory condition.