Before choosing charge points for your workplace, find out how much spare capacity your electrical supply has. It’s the factor that shapes almost every other decision, from how many chargers you can install to whether you need to apply to the network operator for an upgrade.
How many chargers can my site support?
That depends on your incoming supply and your existing demand. A survey will show what headroom you have. Load management can stretch that further by sharing available power across several chargers and reducing output when the building is busy, which often avoids a costly supply upgrade.
Do I need to tell the network operator?
Usually, yes. Most EV installations need to be notified to your Distribution Network Operator (DNO), and larger ones may need approval before work starts. A good installer handles this for you.
Who will use the chargers?
This matters more than people expect. Staff-only chargers are simpler. If visitors or the public will use them, you’ll want payment options, clear signage, and a layout that follows accessibility guidance (PAS 1899) so drivers with disabilities can use them comfortably.
Should I charge people to use them?
Networked chargers running on the OCPP standard let you set tariffs, restrict access to staff, and see usage reports. Choosing an open standard also means you’re free to switch software provider later without replacing hardware.
What about the groundworks?
Cable routes, trenching and parking bay layout can make up a large share of the cost. Siting chargers close to the supply keeps this down, so it’s worth considering before you decide which bays to use.
Our approach
Penmilne install commercial and workplace EV charging across Hitchin and the surrounding 30 miles. We survey your supply, design the layout and load management, handle DNO notifications, and commission the system with its back office so it’s ready to use from day one.
FAQs
How long does a workplace installation take?
Small installations can be done in a day or two. Larger sites with groundworks take longer.
Can chargers be added later?
Yes. We can install ducting and capacity for future chargers now to keep expansion costs down.
Thinking about EV charging for your workplace?
We’ll survey your supply, recommend the right setup for your site and handle everything from DNO notification to commissioning.